GSA · Designer & Manufacturer · Hong Kong

Project Portfolio Tracker

Eighteen living trackers across the business — product projects, whole accounts, key partners/suppliers, internal NPD categories and group ops — as of 01 July 2026. Compiled from a 3-year review of GSA work mail and the project document archive. Each card opens a one-page living tracker.
How to use: click any project to open its tracker. Each tracker shows where the project is, what's pending and urgent, how the customer and factory feel, upcoming orders, and links to supporting documents. Refresh as status changes — these are living documents.
01
Manscaped — Crop Shaver 2.0 / Roller Handle
Customer: Manscaped (USA) · New product development
R2 hinge/ejection fix gated on Manscaped — test standard + cartridge-change decision both overdue since 23 Jul (chasing) · factory: new mould-fix parts due Fri 31 Jul (Andy, 27 Jul) · collect overdue tooling balance.
● Under pressure
~$17.2k tooling PO
Pilot tooling → T2
Open tracker →
02
Reset Razor
Customer: Reset (Australia) · Handles + blade refills
Protect the 2 Sep ship / Oct planogram — WB sampling/prototypes (due ~24 Jul) now overdue, chasing; 42-day production runs from the approved sample · collect payment on the 2 invoiced POs (~$25.2k) · chase ~$15.7k legacy AR.
● Watch payment
~$25.2k order
Production / repeat PO
Open tracker →
03
Schick Intuition Glow (+ Glow Lite)
Customer: Edgewell · EU production (handles + shower hangers)
Hold the 12 & 28 Aug deliveries (198k pcs) · Glow Lite: both legs now PO’d — GSAINN-154 to Centreline ($2.34k) and Edgewell PO #8000200091 at the full $3,200 (28 Jul) — Albert’s questions answered 28 Jul: design ≈11 Aug, handle COG ~1 wk after CAD · Vitech 2nd-source: price matched at 20K — qualify?
● In production
~$106.1k order
PO #2450977741-2
Open tracker →
04
Nomad — Bamboo Disposable Razor
Lead client: Naked Planet (UK) + NHS + B2B pipeline
Convert Naked Planet's first PO (slipped to ~Sept): FOB price + samples + BIC comparison · NHS decks now sent to England/Wales/NI (24 Jul) · chase the 22 Jul strategy-call read-out (plastic-free claims; still overdue).
● Convert now
$0.454/u @500k EXW
Pre-first-order + outreach
Open tracker →
05
Schick Silk4 Handle
Customer: Edgewell · Production complete
Settle the $27,097 tooling amortization ($0.374/handle).
● Closing out
~$27.1k amortization
Commercial close-out
Open tracker →
06
Project Arihel — BOA Connector
Customer: Edgewell (Komodo) · NPD CAD & prototypes
Answer prototype colours + texture point to Centreline · new 28 Jul scope: Adam requested 2D line drawings (BOA+Komodo), Centreline quoting same day (drawing-type scope question back with GSA) · PO balance still unconfirmed (Carolina routed GSA to Edgewell accounts payable); Komodo tooling pushed again (Jan risk).
● POs received
~$14.8k order
CAD → prototypes · active
Open tracker →
07
Bombay Shaving Company
Customer: BSC (India) · Production + new project
BSC buyer sign-off on GSAHK-418 now overdue (was due 20 Jul) — factory can’t start & the 1 Sep ship is at risk (42-day lead) · collect tooling payment + #0315 deposit · quote new sleeve project.
● Production PO issued
~$22.05k order
Production + scoping
Open tracker →
08
Edgewell — Account & Production Portfolio
Customer: Edgewell (Schick/WS) · account-level, above Glow/Silk4/Arihel
Decide GSA risk-share on the Helium material commitment (Schick “no-caveat” terms) · MEX Buffalo PO 2450981809 landed 24 Jul ($13.9k, 12,600 pcs, deliver GZ 31 Aug — molding, on track per Tsui ops report 27 Jul) · Helium shipped 21 Jul (Inv #0348 $40.4k) · formalise Schick QA liability.
● Largest account · ~75% rev
~$13.9k sell PO
Production + 4 NPD lines
Open tracker →
09
GSA Business Health — Cash / AR / AP
Internal · GSA Group — cross-entity cash view
22 Jul email compromise — customers told to change GSA bank details; confirm none acted · chase Reset ×4 (transfers bouncing), BSC ~$29.5k & Manscaped ~$8.6k · fix EU / inter-co billing.
● Cashflow tight
AR ~$204.8k est.
Group cash view
Open tracker →
10
WB / Weibao — Factory Health & Quality
Supplier · incumbent factory (Edgewell/BIC/Reset/BSC)
Manage WB solvency / going-concern risk ($15.9k remitted 23 Jul; WB20260230 disputed, WB20260080 unconfirmed) · accelerate the Vitech/Flywheel migration hedge · close the Glow paint/carton CAPAs · Silk4 green 22.4K passed 22 Jul re-inspection. NOTE: the “worst quality in 25 years” framing could not be corroborated in a separate mailbox review — treat as unverified.
● Quality issues (severity unverified)
Glow 99K+99K live
CAPAs open
Open tracker →
11
Dorco — SVA2100 Power-Handle Account
Customer: Dorco (Korea/Vietnam) · SVA2100, built at UTrust
Resolve the open battery-swelling defect (claim risk) · IPX cert · confirm new Dorco Vina contact.
● Battery defect open
No live PO (last Oct 2025)
Active · #2 account
Open tracker →
12
Centreline — Design & Engineering Partner
Partner/supplier · UK design & engineering house (all programs)
Clear disputed INV-10015 ($4.8k, 5+ mo) · pay down ~$14.25k on 7-day terms · Glow Lite design PO’d (GSAINN-154, $2.34k, 27 Jul) · BOA+Komodo 2D line-drawings quote incoming (28 Jul; scope question back with GSA) · Estrid intro (28 Jul 9am BST) — invite accepted, chase outcome.
● ~$14,250 owed
~$8.1k CAD (buy)
Critical partner · strained
Open tracker →
13
BIC Blade Tech — Account
Customer: BIC BBT (Greece/France) · Sep-2026 closure now unverified — only NA/Mexico consumer ops confirmed closing
Confirm ~$48.5k WB-settlement fraud recovery status with Clare Daly · Modular GS067 PO · NEO 20% defect.
● Possible payment fraud · unresolved
Recovery / wind-down (date unverified)
Open tracker →
14
Modular Handle Platform
NPD category · cross-customer connector / sleeve platform
File the connector patent (still in draft) · BOA: 2D line-drawings request (28 Jul) — drawing-type + texture answers with GSA, Pantone colours still with customer · SPLASH: still no reworked drawings (17 Jul QA rejection) · chase the GS067 PO.
● Cross-customer platform
~$14.8k pull-through
NPD · connector IP
Open tracker →
15
Electric Trimmers (sourced)
NPD category · own-brand + 10+ brands · UTrust / Leyi
Chase the FFS decision (mtg 15 Jul — no outcome as of 25 Jul) · put the drafted 23 Jul offer sheet to FFS · UTrust sample dispatch (re-promised ~24 Jul) now overdue — 2nd slip · Geenew sample dispatch (~25–27 Jul) also lapsed — chase Nacy.
● First powered category
$5.74–8.82 EXW offer (draft)
NPD · emerging
Open tracker →
16
Friction Free Shaving (FFS) — UK Account
Customer: Friction Free Shaving (UK) · re-engaged
CEO “FFS Reset” escalation — dispatch to Des still unconfirmed (27 Jul follow-up window lapsed) — give Nigel a sent-vs-outstanding status · Pritech quoted 2 women’s ceramic-blade models 28 Jul (buy $6.00–7.55, MOQ 10K, valid 31 Aug) · refill-cartridge quote in 24 Jul (buy $0.30–0.35; no Gillette-style cart yet) · convert the verbal 50K + 200K carts to a PO.
● Verbal 50K + 200K carts
50K+200K verbal (no PO)
Active · early
Open tracker →
17
New-Business Pipeline / Win-Back Watch-List
Internal · 15 warm / dormant leads
Quote Azmusebat (1.5M/yr, samples out) · Estrid intro (28 Jul 9am BST) — invite accepted, slot passed, chase outcome · chase Waken reorder · Treet MSA · promote a line on first PO.
● 15 leads on watch
Watch · promote on PO
Open tracker →
18
Estrid — Sustainable Mini-Handle
Estrid (EU DTC) · via Edgewell referral
Capture the 28 Jul intro-call outcome (no readout on file) · answer Camussa’s actual question — a non-petroleum disposable Mini handle, costed · chase whether Nigel joins the Edgewell↔Estrid meeting · still no Estrid-side contact.
● Pre-commercial
— no quote yet
New · Edgewell referral
Open tracker →
Portfolio at a glance — 17 trackers.   Accounts: Edgewell · Dorco · BIC · Bombay · Reset · Manscaped · FFS Edgewell products: Glow · Silk4 · Arihel Partners / supply: Centreline · WB factory NPD categories: Modular platform · Electric trimmers · Nomad bamboo Internal: Business Health · Win-back watch-list
Shared resources: incumbent factory WeiBao “WB” (dywbtoy — current quality crisis); UTrust (Dorco electronics + trimmers); ViTech 2nd-source (“Project Flywheel”); engineering/procurement partner Centreline (UK); commercial via RazorLite (Nigel).   Hottest right now: WB quality crisis, Dorco battery defect, Edgewell forecasts/QA-liability, Centreline payables, FFS verbal order, the 24-Jun bamboo hospitality blast.